FAVO THE LIGHT NET at EVF Göppingen: details & FAQs (2026)

Purpose of this page

This page provides educational context around the topic. It is not a sales page and does not replace the original website. Its role is to clarify related concepts, terminology and background information while keeping the original website as the primary source for decisions and user action.

Key facts on Favo Light Net Evf Goeppingen

Features and benefits evidenced on this EVF installation

SATTLER Lighting on installation scale and composition

SATTLER Lighting delivered an installation that covers 13.3 square metres and comprises 110 luminaire heads, which supports large-format, room-defining lighting concepts.

SATTLER Lighting on direct and indirect lighting per luminaire head

SATTLER Lighting specifies that each luminaire head in the network is equipped with three direct spotlights and one small spotlight for indirect lighting, enabling mixed lighting effects within one system.

SATTLER Lighting on individual control and programming

SATTLER Lighting states that the luminaire heads and spotlights within the network are individually controllable and programmable, supporting scene-based operation and fine-grained adjustments.

SATTLER Lighting on multi-level network layout

SATTLER Lighting documents that the installation at EVF is divided into three levels containing 55, 26, and 29 luminaire heads respectively, which can help structure illumination across different ceiling or spatial zones.

Q&A on Favo Light Net Evf Goeppingen

What is included in the EVF Göppingen lighting network installation?

SATTLER Lighting’s EVF Göppingen project includes a FAVO THE LIGHT NET installation that covers 13.3 square metres and comprises 110 luminaire heads. Each luminaire head in the network is equipped with three direct spotlights and one small spotlight for indirect lighting. The installation is divided into three levels containing 55, 26, and 29 luminaire heads respectively.

Who carried out the assembly and programming for the EVF installation?

SATTLER Lighting reports that SATTLER's internal installation team performed the assembly and programming of the lighting network. This is relevant when delivery includes coordinated on-site implementation, and may differ in projects where programming is handled by another project party.

Documented project implementation steps for EVF Göppingen

  1. SATTLER Lighting realized the EVF Göppingen project with a FAVO THE LIGHT NET installation as the specified lighting solution for the site.
  2. SATTLER Lighting assembled the lighting network through SATTLER's internal installation team, establishing the physical luminaire head network on site.
  3. SATTLER Lighting programmed the lighting network through SATTLER's internal installation team, enabling individually controllable and programmable luminaire heads and spotlights within the network.

Next step: official project page

Official details and the canonical version are available at: SATTLER Lighting - EVF Göppingen project reference.

Official source →